FOOD & BEVERAGE MANUFACTURING

From mix to
finished pack.

Dry, semi-dry and powder products, made across our production network in Türkiye and Tunisia. Explore the manufacturing behind our brands and customer projects.

FlavourTech production equipment on a packaging line
5production facilities
2manufacturing countries
19,000tonnes annual production
Since 1992food and beverage manufacturing

THE PRODUCTION NETWORK

Different products.
The right production site.

Four facilities in İzmir, Türkiye, and one in El Agba, Tunis, Tunisia. Product, process and packaging requirements determine the site and line for a project.

İZMİR · TÜRKİYE

Çınar Sokak

Our Çınar Sokak site blends and packs fruit-flavoured instant drinks, dry dessert and bakery mixes, seasonings and soup mixes.

BRCGS and IFS certification support the manufacturing activities covered at this site. Our team can confirm the scope for your product.

İZMİR · TÜRKİYE

Ayfer Sokak

At Ayfer Sokak, we produce bouillon in powder, pressed-cube and jelly formats, alongside sauce, seasoning and soup mixes.

Product and format are matched to the relevant manufacturing and certification scope.

İZMİR · TÜRKİYE

Yalçın Yolu

Our Yalçın Yolu site mixes and packs instant coffee, coffee mixes, creamers and hot chocolate.

Flexible packs and HDPE jars are among the formats covered by the site’s BRCGS certification.

EL AGBA, TUNIS · TUNISIA

Noodles and ramen

Our Tunis operation is dedicated to noodles and ramen, with production including mixing, steam cooking, forming, frying and cooling.

Packaging formats are reviewed against the product, line and project requirements.

These site examples explain the production scope. The manufacturing location for your item is confirmed during the technical and commercial review.

A FlavourTech operator working at production controls

PEOPLE AND PRODUCTION

A process agreed
around your product.

We review your specification or benchmark, develop the recipe, prepare samples and agree the product and packaging before commercial production.

The brief covers the market, product requirements, intended pack and expected volumes. Minimum order quantities depend on the item and are confirmed at quotation.

Our own brands, private-label projects and industrial supply use different commercial routes. The starting point is the same: understand what the product needs to do.

See the private-label process

FROM FIRST BRIEF TO PRODUCTION

Clear decisions
before the line runs.

Each project has its own requirements. These are the main decisions we work through together.

  1. Brief

    Product, market, benchmark, format and expected volumes.

  2. Develop

    Recipe work and samples for the project requirements.

  3. Agree

    Product reference, specification, packaging and commercial details.

  4. Produce

    Manufacturing and packing at the relevant production site.

  5. Document

    Product information and the agreed supporting documentation.

KNOW WHAT SITS BEHIND THE PRODUCT

Production is one part.
Assurance is another.

Review the way we check products and the documents that apply to the named manufacturing sites.

BEFORE WE TALK

A few practical questions.

Can you manufacture a product under our brand?

Private-label projects are reviewed against the recipe, market, packaging and expected volumes. Our private-label page explains the process, including the existing process videos.

Can you reproduce a benchmark?

Share the benchmark and the characteristics that matter. Recipe development and sample evaluation establish what can be agreed for the project.

What is the minimum order quantity?

It depends on the item, manufacturing process and packaging. The applicable minimum is confirmed with the quotation.

Can we discuss a factory visit?

Contact the team with your product and project details so the relevant site and visit arrangements can be discussed.

BUILD THE RIGHT BRIEF

Tell us what
you want to make.

Send the product family, market, pack format, benchmark or specification, and expected volumes. We can then review the manufacturing route.

Discuss your requirement